VED crew lowering pipe into a trench with shoring
Capability

UndergroundUtilities.

Sanitary sewer, water main, storm drainage, and dry conduit installed by in-house pipe crews — sequenced into the earthwork schedule, not bolted on after the fact.

  • Self-PerformedNo subcontractor risk
  • Licensed & InsuredVA Class A · Bonded
  • 120+ Field CrewIn-house operators
  • 49 YearsOperating since 1976
Virginia DOTAssociated General ContractorsOSHAAmerican Public Works AssociationBuild VirginiaVirginia DOTAssociated General ContractorsOSHAAmerican Public Works AssociationBuild VirginiaVirginia DOTAssociated General ContractorsOSHAAmerican Public Works AssociationBuild VirginiaVirginia DOTAssociated General ContractorsOSHAAmerican Public Works AssociationBuild Virginia
About this service

One team, one accountable underground utilities partner.

Our pipe crews install sanitary sewer, water main, storm drainage, and dry conduit to municipal and private specifications. We own the trench boxes, the pipe lasers, the vac excavators, and the boring rigs — so the work moves on our schedule.

Because utilities are sequenced inside the same project plan as earthwork and stormwater, there are no inter-trade delays and no finger-pointing when conditions change in the trench.

What's included
  • 01Sanitary sewer, water main, force main, and storm drainage
  • 02Dry utility conduit, duct bank, and primary electric coordination
  • 03Trench safety, shoring, and confined-space competent persons on every crew
  • 04Pressure testing, vacuum testing, video inspection, and as-built documentation
VED utility installation in progress on a commercial site
In the field
Licensed, Certified & Insured

Backed by the industry’s
most rigorous certifications.

Every site development project is delivered by a Class A licensed firm with full insurance, OSHA-trained supervisors, and a verified safety record — so you can award the contract with complete confidence.

VDOT Prequalified

Virginia DOT

VDP-2024

Class A Contractor

DPOR Virginia

Lic. 2705-023

OSHA 30-Hour

U.S. Dept. of Labor

Certified

EMR 0.68

Verified Safety Rating

Below Avg. Industry

DBE Certified

SWAM Virginia

Registered

ISO 9001

Quality Management

Compliant
Featured projects

Recent underground utilities work on the ground.

Chesterfield Sanitary Extension
Wet Utilities· 14,000 LF

Chesterfield Sanitary Extension

14,000 LF of sanitary sewer and water main installed and pressure-tested through active commercial corridors with zero service interruptions.

LocationChesterfield County, VA
Length14,000 LF
TestsFirst-pass pass
View Project Details
01 / 03
Wet Utilities · 14,000 LFView All Projects
Frequently asked

The questions owners ask us first.

Don’t see what you’re looking for? Reach out and a project lead will answer directly.

Talk to a project lead

How do you keep large site work on schedule?

Every phase is sequenced before mobilization. Crews, equipment, and materials are staged against a critical-path schedule so daily progress is measurable and recoverable.

Get Started

Build Something Significant.

Virginia's most capable site development crew is ready for your next project.