1.8M CY of mass excavation on a site that demanded careful sequencing, tight tolerances, and zero tolerance for schedule slip. The work touched live operations and surrounding infrastructure, so every phase had to be planned around the people and traffic moving through it.

Loudoun Data CenterPad.
Balanced cut-and-fill on a 1.8M CY data center pad with GPS machine control holding subgrade tolerances within ±0.1 ft.
- Self-PerformedIn-house crews & fleet
- On ScheduleDaily field reporting
- 0.68 EMRFar below industry avg.
- VDOT PrequalifiedGovernment & DOT certified

Loudoun Data Center Pad
Balanced cut-and-fill on a 1.8M CY data center pad with GPS machine control holding subgrade tolerances within ±0.1 ft.
- LocationLoudoun County, VA
Volume
Duration
How we deliveredthis project.
A look at the planning, execution, and outcomes that defined this build — from the first walkthrough to the final inspection.
VED self-performed every discipline on this project — clearing, mass earthwork, utilities, stormwater, and structural work — using owned equipment and in-house crews. A single project lead carried the work from preconstruction through closeout, with daily field reports and weekly executive reviews keeping the schedule honest.
Balanced cut-and-fill on a 1.8M CY data center pad with GPS machine control holding subgrade tolerances within ±0.1 ft.
Other projects from our portfolio.
A cross-section of the campuses, corridors, and civil infrastructure VED has self-performed across Virginia and the Mid-Atlantic.
Build Something
Significant.
Virginia's most capable site development crew is ready for your next project.